McGeever Ltd have been involved in Project Safety for the last 4 years since the company was founded in May 2019. 

We have provided H&S expertise at the coalface of every project to ensure the teams involved in the on-site activities are safe and compliant at all times. Our commitment is to make sure that you get the highest quality of support from us. 

With nearly 40 years of experience in manufacturing and project safety, delivered on global projects, McGeever Ltd can support your project with confidence and experience. 

Zeelandia Jam Line re-location 

Client - Flemings Zeelandia 

Principal Designer - Torney Ltd 

Principal Contractor - Ingredient Batching Systems Ltd

F10 Notifiable - No 

Project Start - Dec 2022 

Project Finish - April 2023

Appointment 1 - CDM 2015 Site Manager for Installation (100% On-site attendance)

Appointment 2 - Site Engineer - CEng | Grad IOSH

Special conditions: -  Time limited due to stock levels of reserve product. Space constraints of access and egress of the equipment. Food hygiene protection required on all food pipework interfaces and connections.

Jam manufacturing line

Great Britain Cycling Team - Wind Tunnel Installation 

Client - British Cycling/ Nuffield Health  

Principal Designer - Bradshaw Gass and Hope LLP

Principal Contractor - City Build/ Hawkins Projects Ltd 

F10 Notifiable - Yes 

Project Start - Jan 2022 

Project Finish - March 2023

Appointment 1 - CDM 2015 Site Manager for Installation (100% On-site attendance)

Appointment 2 - H&S Consultant for the GBCT Wind Tunnel commissioning process (CAUK Marking, PUWER and Fire assessments)

Special Conditions: - Re-location and redesign of new position inside the MiHP building in Manchester. CAUK requirements to be brought in line with previous CE marking. Work at height on non-regular framework. Fire risk assessment.

British Cycling Wind Tunnel

New Bakery Line for Manchester Bakery 

Client - Fine Lady Bakery 

Principal Designer - HBE

Principal Contractor - Hawkins Projects Ltd 

F10 Notifiable - Yes 

Project Start - May 2019  

Project Finish - December 2019 

Appointment 1 - CDM 2015 Site Manager for Installation (100% On-site attendance)

Special Conditions: - Multi-zone site with over 500 inductions and over 50 different sub-contract companies in attendance. Ground works, robot pads for robot cells, new 2 storey office block, new 2 storey dry ingredients storage building, washout area, 3 x 80te flour silos for installation, full new production line to deliver 1m+ loaves per week

Bread making manufacturing line